Client

Spokane County

Year

2019

Awards

NAPA Quality in Construction

About the project

This project was a full reconstruct of the existing roadway. Poe Asphalt placed two 2.5″ lifts of base aggregate. This project had to allow for local traffic to not be impeded in any way. We worked in closures along with the prime contractor to provide a high quality project for both Poe Asphalt and the owners. Partnering with the owner, prime contractor and sub contractors allowed us to achieve a safe workplace with quality at the forefront.