About the project
This project consisted of a 4” asphalt removal and addition of supplemental rock. The rock was regraded to provide better drainage, as well as the addition of two new drywells to catch the new water. 4” of HMA was placed on top to deliver a new surface to the shipping company. This project required strict coordination with the owner as they continued to ship product during construction.