About the project
This project required various asphalt sections to complete the project. Poe Asphalt was a sub on the job, and only provided the asphalt and striping. This included 2” and 3” asphalt in the Cedar’s lot and new boat storage facility. The existing road was pre-leveled and overlaid with 1” HMA to provide structure as well as a smoother surface.