About the project

This projected consisted of a ½” chip seal over the existing surface. CRS-2P liquid was used along with a ½” chip that came from Poe Asphalt’s state line pit. Quickseal 50-50 was used as the fog material to give it a black sheen and a final layer of bond on the chip. With striping this project was completed in under 4 days.