Highway 41 – Rathdrum

This project consisted of a CTB and overlay. The existing material was pulverized in place and cement was added to the base and regraded with water. You wait for the optimal water percentage and micro crack with a roller prior to overlaying. Poe Asphalt completely redesigned the plans (as there was major busts) with the State of Idaho to deliver this project on time and under budget.
Archive

Client

Idaho Transportation Department

Year Completed

2016

Role

Primary Contractor

Where

Rathdrum, ID
Tagline

Stat Highlight

XX

Stat Title

XX

Stat Title

XX

Stat Title

About The Project

This project consisted of a CTB and overlay. The existing material was pulverized in place and cement was added to the base and regraded with water. You wait for the optimal water percentage and micro crack with a roller prior to overlaying. Poe Asphalt completely redesigned the plans (as there was major busts) with the State of Idaho to deliver this project on time and under budget.

No items found.
For asphalt & Aggregate Assistance

Contact us

Feel free to connect. We’d love to chat.

Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.