Highway 41 – Rathdrum
This project consisted of a CTB and overlay. The existing material was pulverized in place and cement was added to the base and regraded with water. You wait for the optimal water percentage and micro crack with a roller prior to overlaying. Poe Asphalt completely redesigned the plans (as there was major busts) with the State of Idaho to deliver this project on time and under budget.

Tagline
Stat Highlight
XX
Stat Title
XX
Stat Title
XX
Stat Title
About The Project
This project consisted of a CTB and overlay. The existing material was pulverized in place and cement was added to the base and regraded with water. You wait for the optimal water percentage and micro crack with a roller prior to overlaying. Poe Asphalt completely redesigned the plans (as there was major busts) with the State of Idaho to deliver this project on time and under budget.
For asphalt & Aggregate Assistance
Contact us
Feel free to connect. We’d love to chat.
Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224