Lovell Valley Road – State Hwy 41
This projected consisted of a ½” chip seal over the existing surface. CRS-2P liquid was used along with a ½” chip that came from Poe Asphalt’s state line pit. Quickseal 50-50 was used as the fog material to give it a black sheen and a final layer of bond on the chip. With striping this project was completed in under 4 days.

Tagline
Stat Highlight
XX
Stat Title
XX
Stat Title
XX
Stat Title
About The Project
This projected consisted of a ½” chip seal over the existing surface. CRS-2P liquid was used along with a ½” chip that came from Poe Asphalt’s state line pit. Quickseal 50-50 was used as the fog material to give it a black sheen and a final layer of bond on the chip. With striping this project was completed in under 4 days.
For asphalt & Aggregate Assistance
Contact us
Feel free to connect. We’d love to chat.
Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224