Lovell Valley Road – State Hwy 41

This projected consisted of a ½” chip seal over the existing surface. CRS-2P liquid was used along with a ½” chip that came from Poe Asphalt’s state line pit. Quickseal 50-50 was used as the fog material to give it a black sheen and a final layer of bond on the chip. With striping this project was completed in under 4 days.
Public Works

Client

Coeur d’Alene Tribe

Year Completed

2018

Role

Primary Contractor

Where

Plummer, ID
Tagline

Stat Highlight

XX

Stat Title

XX

Stat Title

XX

Stat Title

About The Project

‍

This projected consisted of a ½” chip seal over the existing surface. CRS-2P liquid was used along with a ½” chip that came from Poe Asphalt’s state line pit. Quickseal 50-50 was used as the fog material to give it a black sheen and a final layer of bond on the chip. With striping this project was completed in under 4 days.

No items found.
For asphalt & Aggregate Assistance

Contact us

Feel free to connect. We’d love to chat.

Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.