Lumberjack Lane – State Hwy 41
This project consisted of a 3” asphalt removal and 6” pulverization in place of the base material. The base material was regraded, and 3” HMA was placed on top. Fiber was introduced at the asphalt plant to give stiffness to the product, and help it hold up in the long run.

Tagline
Stat Highlight
XX
Stat Title
XX
Stat Title
XX
Stat Title
About The Project
This project consisted of a 3” asphalt removal and 6” pulverization in place of the base material. The base material was regraded, and 3” HMA was placed on top. Fiber was introduced at the asphalt plant to give stiffness to the product, and help it hold up in the long run.
For asphalt & Aggregate Assistance
Contact us
Feel free to connect. We’d love to chat.
Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224