Lumberjack Lane – State Hwy 41

This project consisted of a 3” asphalt removal and 6” pulverization in place of the base material. The base material was regraded, and 3” HMA was placed on top. Fiber was introduced at the asphalt plant to give stiffness to the product, and help it hold up in the long run.
Public Works

Client

City of St. Maries

Year Completed

2018

Role

Primary Contractor

Where

St. Maries, ID
Tagline

Stat Highlight

XX

Stat Title

XX

Stat Title

XX

Stat Title

About The Project

This project consisted of a 3” asphalt removal and 6” pulverization in place of the base material. The base material was regraded, and 3” HMA was placed on top. Fiber was introduced at the asphalt plant to give stiffness to the product, and help it hold up in the long run.

No items found.
For asphalt & Aggregate Assistance

Contact us

Feel free to connect. We’d love to chat.

Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.