US-95 N Moctileme to N of Plummer
This project included rehabilitation of approximately 10 miles of US-95 in Benewah County. Poe Asphalt performed shoulder improvements at various locations throughout the project limits, removal and new-installation of guardrail, asphalt milling, asphalt overlay and inlay and shoulder rocking. Our team used green paving practices, incorporating reclaimed asphalt pavement (RAP) into the project mix. This cut greenhouse emissions, reduced project costs, and required less virgin aggregate.

Tagline
Stat Highlight
XX
Stat Title
XX
Stat Title
XX
Stat Title
About The Project
This project included rehabilitation of approximately 10 miles of US-95 in Benewah County. Poe Asphalt performed shoulder improvements at various locations throughout the project limits, removal and new-installation of guardrail, asphalt milling, asphalt overlay and inlay and shoulder rocking. Our team used green paving practices, incorporating reclaimed asphalt pavement (RAP) into the project mix. This cut greenhouse emissions, reduced project costs, and required less virgin aggregate.
For asphalt & Aggregate Assistance
Contact us
Feel free to connect. We’d love to chat.
Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224



