US-95 Smith Creek to Sheep Creek Stg 2
The scope of work on this project included placing 3 lifts of hot mix asphalt on a newly reconstructed base (by others). US-95 is highly traveled, which required our trucking needs for transporting the HMA to the project to be highly coordinated and monitored so as to minimize delays to the traveling public while still maintaining production of our crew. Green paving practices, which included use of reclaimed asphalt pavement (RAP) into the project mix was used on this project in order to reduce greenhouse gas emissions, and required less virgin aggregate.

Tagline
Stat Highlight
XX
Stat Title
XX
Stat Title
XX
Stat Title
About The Project
The scope of work on this project included placing 3 lifts of hot mix asphalt on a newly reconstructed base (by others). US-95 is highly traveled, which required our trucking needs for transporting the HMA to the project to be highly coordinated and monitored so as to minimize delays to the traveling public while still maintaining production of our crew. Green paving practices, which included use of reclaimed asphalt pavement (RAP) into the project mix was used on this project in order to reduce greenhouse gas emissions, and required less virgin aggregate.
For asphalt & Aggregate Assistance
Contact us
Feel free to connect. We’d love to chat.
Lewiston Division:
(509) 758-5561
3305 Hatwai Rd, Lewiston, ID 83501
Pullman Division:
(509) 334-6400
5991 WA-270, Pullman, WA 99163
Post Falls Division
(208) 777-0498
2732 N Beck Rd, Post Falls, ID 83854
Spokane Division:
(509) 244-8909
7909 S Grove Rd, Spokane, WA 99224



